2019上半年信息系统项目管理师上午综合知识真题(八)

责编:胡媛 2019-05-27

71.The  (  )  creates opportunities for more direct Integration of the physical word into computer-based systems, resulting in efficiency improvements, ecomomic benefits, and reduced human exertions.

A.internet of things

B.cloud computing

C.big data

D.mobile internet

72.(   )  is an open, distrbuted ledger that can record transations between two parties efficiently and in a verifiable and permanent way.

A.Internet of things

B.Blockchain

C.Edge computing

D.Artificial intelligence

73.(   )  are those costs that cannot be directly traced to a specific project and therefore will be accumulated and localted equitably over multiple projects by some approved and documented accounting procedure.

A.Direct costs

B.operation costs

C.Indirect costs

D.Implement costs

74.Earned value management(EVM) integrates the scope baseline with the   (   )  baseline, along with schedule baseline,to form the performance baseline, which helps the project management team assess and measure project performance and progress.

A.qulity

B.risk

C.change

D.cost

75.(   )  risks cannot be management proactively and therefore may be assigned a mangement reserve.

A.Know

B.Natural

C.Unknown

D.Human


相关推荐:2019上半年信息系统项目管理师上午真题及答案

在线题库:信息系统项目管理师历年真题自测估分

               2026下半年软考各科备考资源
资源名称获取方式资源链接
2026年5月第一批集成综合知识真题免费下载点击获取
2026年5月 软件设计师综合知识真题免费下载点击获取
2026年5月系统分析师案例技术真题免费下载点击获取
2026上半年软考各科真题答案汇总免费下载点击获取
2026年5月23日系统架构设计师综合知识真题免费下载点击获取
【历年真题】软考各科历年真题答案解析汇总免费刷题点击刷题
更多软考备考资料请点此查看


更多资料
更多课程
更多真题
温馨提示:因考试政策、内容不断变化与调整,本网站提供的以上信息仅供参考,如有异议,请考生以权威部门公布的内容为准!
相关阅读
查看更多

加群交流

公众号

客服咨询

考试资料

每日一练

咨询客服