专注在线职业教育24年
下载APP
小程序
希赛网小程序
导航

2018上半年系统集成项目管理工程师上午真题(八)

责编:胡媛 2018-05-30

● (71) is a programming model and an associated implementation for processing and generating big data sets with a parallel, distributed algorithm on a cluster. The model is a specialization of the split-apply-combine strategy for data analysis.

(71) A. HDFS B. Chukwa C. MapReduce D. HBase

● The IoT architecture can be divided into three layers.  (72) is the key layer to realize the foundational capabilities which support the electronic devices interact with physical world.

(72) A. Sensing layer B. Network layer

C. Application layer D. Operation layer

● Project Integration Management includes the processes and activities to identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process Groups. (73) process does not belong to Project Integration Management.

(73)A. Developing project charter

B. Developing project management plan

C. Analyzing project risks

D.Monitoring and controlling project

● In project management and systems engineering, (74 ) is a deliverable-oriented breakdown of a project into smaller components. It is a key project deliverable that organizes the team's work into manageable sections.

(74) A. RBS  B. PBS

C. GBS  D. WBS

● (75) is the sum of all budgets established for the work to be performed.

(75) A. CPI  B. BAC  C. SPI  D. EAC



>>>>>>2018上半年系统集成项目管理工程师上午真题汇总

>>>>>>查看更多系统集成项目管理工程师历年真题

更多资料
更多课程
更多真题
温馨提示:因考试政策、内容不断变化与调整,本网站提供的以上信息仅供参考,如有异议,请考生以权威部门公布的内容为准!
相关阅读
查看更多

加群交流

公众号

客服咨询

考试资料

每日一练

咨询客服